Getting started

What Blast is, your first call in a few minutes, and how to get verified so your calls count.

What is Blast

Blast is a Telegram bot that turns a token call into a record nobody can fake. You paste a contract address, send it to your groups, and Blast locks the market cap at that exact second. From then on it tracks how many X the call does, ranks callers on it and pays them.

You areYou get
A callerA locked, public track record. Up to 40% of the trade fee when people buy from your call, and daily Flex rewards for the callers with the most points.
A group ownerVerified calls in your group, live tracking and a leaderboard. 5% of the trade fee from every trade your group refers.
A readerCalls with a real entry and a real result, and one-tap Buy buttons right on the call.
A trader40% of the trade fee back as cashback on every trade you make in the bot, from a wallet whose keys are held by Privy, not by Blast.

Quick start

  1. Open the Blast bot in Telegram and press Start
    The start screen shows the commands that matter most. Tap ๐Ÿ“‹ Full menu for everything, or send /guide any time for a walkthrough with pictures.
  2. Verify you're a human
    Takes a few seconds. Only verified callers can Blast. See Verify your account.
  3. Add the bot to your group and make it an admin
    Without admin rights the bot can't see contract addresses pasted in the group. See Make the bot an admin.
  4. Paste a contract address
    In the bot's chat or in your group. You get a scan card with the market cap, liquidity and volume.
  5. Tap BLAST IT and pick your groups
    Your call lands in every group you picked with your entry locked in.
  6. Watch it run and get paid
    Blast tracks the X, ranks you every day and pays you when people trade your call.
Want to trade too?
Send /wallet to create a wallet in a tap. See Create a wallet.
1. Paste a contract address0:00 / 0:23

Verify your account

Verification keeps bots and farms out, so every call and every reaction on a call comes from a real person. Send /verify to the bot or open Me โ†’ Verify in the app.

  1. Start a private chat with the bot
    So it can message you about your calls.
  2. Pass the human check
    A one-tap check in the app: โœ… Verify now opens it.
  3. Add your reward wallets (optional)
    A Solana and/or an EVM address where your earnings are sent when you claim. Your Blast wallet is used until you set another one with /myrewards.

Your tier then grows with your record: Verified โ†’ Trusted โ†’ Proven. Groups can choose to accept calls only from a minimum tier.

/verify shows what's done and what's left.

Sign in on the websiteNew

The website has everything the bot does, on a bigger screen: your calls, the leaderboards, your wallet, earnings and group settings.

  1. Send /login to the bot
    Or tap ๐ŸŒ Web login in the full menu.
  2. Tap ๐Ÿ” Sign in on the website and confirm
    Blast opens in your browser, already signed in as you. No code, no phone number. Only the person who tapped is signed in, in the browser they opened.

On the website itself you can also sign in with the Telegram button in the header. Inside Telegram, the Blast button next to the message box opens the app with no sign-in at all.

Link your X account
On the website, open Me โ†’ Linked accounts โ†’ Link X to show your X handle on your caller profile. You confirm it on x.com; Blast reads your X id and handle once and keeps nothing else. One X account can be linked to one Blast account.

Open the app

/login: one tap, and the website opens signed in.
Wallet & trading

A wallet for every supported chain in one tap, held by Privy. Buy and sell from any call, across chains, with limit orders and live PnL.

Create a walletPrivy

Protected by

Wallet security is powered by Privy. Blast does not hold your keys.

Your wallets are created in Privy, and every trade is signed in Privy's secure infrastructure. Trades are still one tap.

  1. Send /wallet to the bot
    Or open Wallet on the website or in the app.
  2. Tap ๐Ÿ”‘ Create new wallets
    You get one Solana wallet and one EVM wallet. The EVM wallet works on every EVM chain Blast trades on: Ethereum, Base, BNB Chain, Robinhood Chain and Arc.
  3. Deposit only what you plan to trade
    Send coins to the addresses shown (tap one to copy it). /wallet then shows your total and what sits on each chain.
  4. Back up a key whenever you like: /wallet โ†’ ๐Ÿ”‘ Export
    Keys are never shown when a wallet is created. Export reveals one again, any time.

Export a key

/wallet โ†’ ๐Ÿ”‘ Export Solana or ๐Ÿ”‘ Export EVM โ†’ ๐Ÿ‘ Show private key. The key arrives hidden behind a spoiler, in a message that can't be forwarded or saved, with a โœ… I saved it โ€” delete this message button. Anyone who sees the key can take everything in the wallet, so make sure nobody is watching your screen. Exports are limited to 5 a day. On the website: Wallet โ†’ Export private key.

Import a wallet you already use

/wallet โ†’ ๐Ÿ“ฅ Import Solana or ๐Ÿ“ฅ Import EVM, then send the private key as your next message. The bot deletes your message straight away and keeps the key in Privy. In Phantom: Settings โ†’ Manage accounts โ†’ Show private key. In MetaMask: Account details โ†’ Show private key.

Importing replaces the wallet you have for that chain in Blast. Funds on the old wallet stay with its key, so withdraw or export its key first. Replaced wallets are kept under ๐Ÿ—„ Old wallets, where you can still export their keys.

Keep it safe

  • Only deposit what you trade. This is a trading wallet, not savings.
  • Blast never asks for your key. Any message that looks like a private key is deleted from the chat, even outside the import flow.
  • Set a ๐Ÿ›Ÿ Recovery address in /wallet: an address you control outside Blast. If you ever lose your Telegram account, the team can send your wallets' coins there, and only there.
  • Your Blast wallet is also your main wallet: tips and claims are paid to it unless you set another address in /myrewards. See Reward wallets.
1. Send /wallet0:00 / 0:23
/wallet before you have one: create new wallets or import your own.
Your Solana and EVM wallets, ready. Keys stay hidden until you export one.

Buy and sell

Every Blast has a โšก Quick Buy button, so readers can buy straight from the call. That's what pays callers and group owners, and every trade pays you cashback.

  1. Send /wallet to set up a trading wallet
    Create one (it covers every supported chain) or import your own. See Create a wallet.
  2. Open the trade panel
    Tap โšก Quick Buy on any Blast, ๐Ÿ’ฐ BUY / SELL on a scan card, or send /trade and paste a contract address.
  3. Tap an amount
    The trade is quoted and sent at once. The โณ Sent message says what to expect: the amount out, the minimum after slippage and the price impact. โœ… Bought follows the moment it lands.
  4. Sell from the ๐Ÿ”ด Sell tab
    Sell 25%, 50% or 100%. The tab shows what you hold, what it is worth, your PnL and your entry market cap next to the market cap now.

A 1% fee is taken from each trade and shared as shown in Revenue share. Chains: Solana, Ethereum, Base, BNB Chain, Robinhood Chain, Arc.

  • Tokens still on a launchpad's bonding curve (pump.fun and others) are traded on the launchpad itself, so they can be bought the moment they exist.
  • Every Solana trade is simulated before it is sent. A trade that would fail is refused with the reason and costs nothing.
  • Want to check each trade first? Turn on Confirm trades in Trading settings. The website always confirms.
  • The website has the same trade panel on every token and call page.
Protected byEvery trade is signed in Privy. Blast does not hold your keys.
1. Open the trade panel0:00 / 0:19
The trade panel, Buy tab: one tap buys that amount.
The Sell tab shows your position: value, PnL, entry and now.

Cross-chain tradingNew

Buy a token on any supported chain with the coin you already hold: SOL for a token on Base, ETH for one on Solana. There is no bridge to open and no gas to buy first. Blast routes the order through Relay, it settles in seconds, and if it can't be filled your coins are refunded on the chain they came from.

On EVM chains a small amount of the chain's coin arrives with your buy (โ›ฝ Includes โ€ฆ on the confirm screen), so you can sell later without topping up. Solana can't be topped up this way: keep a little SOL there to sell.

ToTapWhat happens
Buy with another chainโ€™s coin๐Ÿ’ฑ Pay withOn the Buy tab: pick the chain that pays. The token arrives in its own chainโ€™s wallet.
Sell for another chainโ€™s coin๐Ÿ’ฑ ReceiveOn the Sell tab: pick the coin to be paid in. It lands in your wallet on that chain.
Move coins between your wallets๐Ÿ” Cross-swapIn /wallet: SOL on Solana to ETH on Base, ETH to BNB, and so on.
  1. /wallet โ†’ ๐Ÿ” Cross-swap
  2. Pick the chain to swap from, then the chain to swap to
  3. Tap 25%, 50% or 100%, or type an amount
    A little is kept back for network fees.
  4. Tap โœ… Confirm swap
    A swap always asks first, whatever your one-tap setting. You get a message when it arrives.
Gas to sell later
A token bought from another chain lands in a wallet that may hold none of that chain's coin. Buying into an EVM chain then also delivers a little of its coin for network fees, and the confirm screen says so (โ›ฝ). Solana can't be topped up this way: keep a little SOL there to sell.

SOL, ETH and BNB can pay or be paid out; Arc can only receive a token you buy. A cross-chain trade or swap is charged like any trade, and pays you cashback.

Protected byWallet keys are held by Privy, not by Blast.
1. A token on another chain0:00 / 0:23
๐Ÿ” Cross-swap: pick the chain to swap from, then the one to swap to.

Limit orders

Buy or sell later, when a token reaches a market cap you pick: "buy 0.1 SOL at $20K market cap", "sell 50% at $100K".

  1. Tap โฑ Limit buy or โฑ Limit sell on the trade panel
    Or send /orders โ†’ โž• Add order and paste a contract address.
  2. Tap $? MC to set the market cap
    Above the market cap now, the order triggers on the way up; below it, on the way down.
  3. Set the size
    An amount of the chain's coin for a buy, a share of what you hold for a sell.
  4. Tap โœ… Place order
    It lasts 3 days. You can have up to 5 open orders.

Prices are checked every few seconds. A triggered order uses your slippage setting at that moment and you get a message. If your balance isn't enough then, the order closes and nothing is traded. Change or delete an order any time from /orders.

A limit buy: 0.5 SOL of $BCAT at or below $150K market cap.

Positions and PnL

/portfolio (๐ŸŽ’ Positions in the menu) lists every token you bought through Blast and still hold: what it is worth, its market cap and your PnL, with your total value and total PnL on top.

  • Tap a token to open its Sell tab.
  • PnL is worked out from the average cost of your confirmed trades, in the chain's coin and in USD.
  • The trade panel shows the same position for the token you're looking at, with your entry market cap next to the market cap now.
/portfolio: what you hold, its value, market cap and PnL.

Withdraw and send

Withdraw a coin

  1. /wallet โ†’ ๐Ÿ’ธ Withdraw, then pick the chain
  2. Send the amount, or tap Max
  3. Send the address to withdraw to
    Double-check it: transfers can't be reversed.
  4. Tap โœ… Confirm withdrawal
    You get a message when it confirms.

Send a token

๐Ÿ“ค Send (in /wallet or on a token's Sell tab) moves a token to another wallet on the same chain instead of selling it: 25%, 50%, 100% or an amount you type. On Solana it costs about 0.002 SOL when the address has never held that token.

Withdrawals and sends are free: you pay only the network fee. Up to 10 withdrawals an hour.

Protected byWallet keys are held by Privy, not by Blast.
/wallet: your total, each chain's share, your addresses and every action.

Trading settings

โš™๏ธ Settings is on the trade panel and in /wallet.

SettingWhat it does
Buy buttonsUp to 6 amounts per chain (e.g. 1 5 10 25), used by the trade panel and limit buys. โ†ฉ๏ธ Defaults brings back the chainโ€™s own.
SlippageHow far the price may move before a trade is refused. 10% unless you change it.
Confirm tradesOff: a buy or sell button trades at once. On: each trade shows a quote first and waits for โœ… Confirm.
๐Ÿ–ผ Card settingsThe picture on your scan cards
โš™๏ธ Settings: buy buttons per chain, slippage and one-tap trades.

Trading cashback

Every trade you make in the bot pays you back 40% of its fee, whether you bought from a Blast or pasted a contract address yourself. Buying from a caller's Blast never costs you cashback.

You tradeFeeCashback (40%)
$100$1.00$0.40
$1,000$10.00$4.00
$10,000$100$40.00
  1. Trade as usual
    Cashback is credited when the trade confirms, in the chain's coin, to your balance.
  2. See your rate in /earnings or on your profile
    Top traders can get a higher rate. Whenever the default goes up, everyone below it gets the new default; nobody's rate goes down because of it.
  3. Claim it with your other earnings
    Cashback, caller earnings, group earnings and Flex rewards are claimed together, at least $5.00 per chain. See Claim your earnings.
/earnings shows your cashback rate and what it has paid.
Callers

Scan a token, Blast it to your groups with your entry locked, and watch it climb the boards.

Scan a token

Paste any token's contract address into the bot's chat, or into a group the bot is in. A DexScreener, pump.fun or explorer link works too, and so does /scan <address>. The scan card shows:

  • Market cap, all-time high, liquidity, 24h volume and age, live
  • Whether anyone has already called it, and at what market cap (๐Ÿฅ‡ First call)
  • The contract address (tap to copy) and the token's socials
  • ๐Ÿš€ BLAST IT, ๐Ÿ’ฐ BUY / SELL, ๐Ÿ“Š CHART, ๐Ÿ”” TRACK, ๐Ÿ‘ค TOKEN HISTORY and ๐Ÿ”„ Refresh, which redraws the card with the numbers now

Chains: Solana, Ethereum, Base, BNB Chain, Robinhood Chain, Arc.

Scanning is not calling
A scan never creates a call. If you already called the token, you're shown your call instead. Anywhere in Telegram you can also type @bot <address> to post a scan card into that chat.
A scan card: the token now, its all-time high, the CA and the buttons.

Blast a call

  1. Tap ๐Ÿš€ BLAST IT on the scan card
    Or send /blast first and then paste the address.
  2. Tick the groups to send it to, or Select all
    Up to 25 groups at once. Members-only groups you belong to are found for you. Don't see a group? Send /connect in that group, then try again.
  3. Add a thesis (optional)
    One or two lines on why you like it, up to 250 characters.
  4. Tap ๐Ÿš€ BLAST TO N GROUPS
    The Blast lands in each group with your name and the market cap at that second.
Your entry is permanent
Nobody can edit the entry market cap, you included. You can add thesis updates later, and they're posted under the original call. You call each token once: paste it again and you're shown your existing call.
  • Missed a group? Paste the address again and tap ๐Ÿš€ BLAST TO N MORE GROUPS: it goes out with your original entry.
  • If someone called the token in a group before you, your card there names them and their market cap (๐Ÿฅ‡ First call: โ€ฆ). The first call in each group is the one that counts for that group's board and for Flex.
  • By default you can Blast up to 25 times a day into each group. A group's admins can change that limit.
Tick the groups, add a thesis if you like, and Blast.
Your Blast in the group: your name and the entry, locked.

Track your call

Every call has a public page and a card in the feed:

On the cardWhat it means
Peak XThe highest the call has gone since your entry. Never goes down.
Called MC โ†’ current MCThe locked entry next to the market cap right now.
Current XCurrent market cap divided by your entry. Green above 1X, red below.
Verified eng.Replies and reactions from verified humans on your Blast.
  • ๐Ÿ”„ Refresh on a Blast redraws it with the entry, the market cap now, the high since the call and the liquidity.
  • ๐Ÿ“ UPDATE THESIS posts an update as a reply to your Blast in every group it reached, with the market cap now and the milestone it hit.
  • /mycalls lists your calls in the bot. Your profile shows your full record and your Caller Rank.
Paste a token you called: your call, how it's doing, and more groups to send it to.

Card pictureNew

Every card has a picture on top. Send /settings to pick which one your scan cards show:

PictureWhat it shows
๐Ÿ–ผ BannerThe token's banner, or its logo when it has none
๐Ÿ“ˆ ChartThe token's market cap chart

In a group, its admins pick the picture for Blasts and scan cards there, under Card picture in the group's settings.

/settings: Banner or Chart on top of your scan cards.

DEX PAID checksNew

Send /dp <address> in the bot's chat or in a group to see whether a token is DEX PAID: whether its DexScreener profile has been paid for.

  • โœ… DEX PAID: posted under the DEX PAID banner, with how long ago it was paid and the market cap now.
  • โŒ DEX NOT PAID: in a group, the bot then watches it and posts there the moment it is.
  • Groups also hear it on their own: when a token scanned or Blasted in a group gets DEX PAID, the bot posts it there as a reply to the newest card about it.

Up to 30 checks an hour per person.

/dp in a group: paid, or not yet and watched.

Leaderboards

Send /lb for the top callers by cumulative X: the peak of every call that was first in a group, added up. Tap 1D, 1W, 1M or All time to switch the period in place.

  • In the bot's chat it is all of Blast.
  • In a group it shows only that group's callers: calls Blasted into it that were first there.
  • ๐ŸŒ Full leaderboard opens the leaderboards on the website, with callers, calls, groups, earners, tippers and Flex.

How each board ranks is in How leaderboards rank.

/lb in a group: only that group's callers.

Flex rounds

Every day (00:00 to 00:00 UTC) is a round, and every caller starts it at 0 points. Your calls earn points as they climb to new highs, and all of them add up. The 10 callers with the most points share the Flex pot, paid from token creator fees.

  • 10 points for every 0.1x a call climbs: 1.5x = 50, 2x = 100. A call only scores what it gains that day, so a 3x that runs to 5x scores 200.
  • Bonus the first time a call reaches 5x (+50), 10x (+100), 20x (+250), 50x (+500) and 100x (+1,000).
  • 5 calls in a row at 1.8x or less (best in their first 24 hours) cost 50 points.
  • From your 5th call of the day, at least 30% of that day's calls must reach 2x for you to be paid. Below that you stay on the board but are not paid until it is back up.
  • Eligibility: minimum $10,000 MC call, and a 2X from call. A call under 2X scores nothing; once it gets there, its whole climb counts. The first Blast of a token in a group is the one that counts.
  • All-time points, hit rate and Top Blaster badges (#1 in a round) are on your profile.

Send /flex to see today's board, or open the leaderboards. Winners get a message when the round locks. Try it yourself in the leaderboard simulator.

1. Today's board0:00 / 0:15
/flex: today's board, the pool and what each place pays.

Flex cards

Send /flex in a group to post the Flex card of a call that ran: a picture with its peak X, the entry and the high. Flex cards start at 2X. Which call it shows:

  1. The Blast you reply to with /flex
  2. The token after the command: /flex $TICKER or a contract address
  3. Otherwise, your best call in that group

Automatic flexes

You don't have to ask. When a call's peak passes 2X, 5X, 10X, 25X, 50X or 100X, its Flex card is posted as a reply to the Blast in every group it reached (๐Ÿš€ $TICKER hit 5X since the call). One post per call, group and milestone; a jump past several posts only the highest.

Cards of calls at 2X or more carry a ๐Ÿ’ธ Tip caller button.

/flex in a group: the Flex card of your call, with a Tip caller button.

Tip a caller

Good callers deserve tips. Send a caller a thank you straight from your Blast wallet. All of it reaches them; you pay only the network fee.

  1. Send /tip to the bot
    Or tap ๐Ÿ’ธ Tip caller on a call that is up 2x or more, or ๐Ÿ’ธ Tip on the /flex board. That skips the next step.
  2. Send the caller's @username
    Blast finds them even after a username change.
  3. Pick Solana or EVM
    On EVM, pick the chain next.
  4. Pick an amount
    A preset, or โœ๏ธ Custom amount. It is sent in the chain's own coin.
  5. Tap โœ… Send tip
    The caller gets a message, and the tip is announced in the groups you are both in.
Good to know
The tip lands in the caller's reward wallet (their Blast wallet if they haven't set one). Tips can't be undone. Tips under $1 aren't announced, and each pair is announced at most once an hour in a group. The app's Leaderboards page has a Tippers board.
Not verified yet? The tip waits
If the caller isn't verified or has no wallet on that network, nothing leaves your wallet: the tip is saved, they get a nudge, and once they're ready you get a message to send the same tip in one tap.
1. Send /tip0:00 / 0:22
Confirm the tip: the full amount goes to the caller.
Earnings

Cashback, caller and group shares, Flex rewards and tips: where to see them, how to claim, and exactly how each is worked out.

Your earnings

Send /earnings to the bot. It shows numbers and icons only: what you have earned in all, what was paid and what is waiting, one line per way of earning, and what you can claim on each chain.

LineWhat it counts
๐Ÿ† FlexFlex Pot rewards from the daily rounds
๐Ÿ” CashbackYour cashback rate, and what it has paid on your own trades
๐Ÿš€ BlastsYour share of the fee when people buy from your Blasts
๐Ÿ‘‘ GroupsYour owner share of trades your groups referred
๐Ÿ’ธ TipsTips you received (already in your wallet)
๐Ÿ’ฐ UnclaimedWhat is waiting, per chain, ready to claim

A chain marked add wallet needs a reward wallet first; soon means payouts on it aren't open yet. ๐Ÿ“– How it works opens these docs. The same numbers are on the website under Me โ†’ Earnings.

1. Send /earnings0:00 / 0:10

Claim your earnings

  1. Check your reward wallets with /myrewards
    A Solana and/or an EVM address. Your Blast wallet is used until you set another.
  2. Send /earnings
    See cashback, trade fees and Flex rewards, per chain.
  3. Tap ๐Ÿ’ธ Claim, or send /claim
    Your balance is sent to your reward wallet. A claim is at least $5.00 per chain; below that it keeps adding up.

Each chain is one transfer, with a link to the transaction. If payouts are paused on a chain, nothing is sent and your balance stays safe; a claim the team needs to check is paid once it is confirmed. Payouts go live with the token.

/claim: one transfer per chain to your reward wallets.

Reward wallets

/myrewards shows your Flex rewards, what is unclaimed, and the two addresses your claims and tips are paid to: one Solana, one EVM (used on every EVM chain).

  • Your Blast wallet is your main wallet: creating or importing it saves it as your reward wallet too.
  • โœ๏ธ Change pastes a different address, like Phantom or MetaMask. Send only the public address, never a private key or seed phrase.
  • โ†ฉ๏ธ Use Blast wallet goes back to your Blast wallet. An address can be saved on one account only.
  • A pasted address can't trade: Blast doesn't hold its key. To trade from an existing wallet, import it in /wallet.
/myrewards: your rewards and where they are paid.

Flex rewards board

Send /rewards to see who the Flex Pot has paid: the total won across Blast and the top 3 earners. In a group it adds the group's own members, and what trades started there have shared with its callers and owner.

Your own rewards are in /myrewards; the board is everyone's.

/rewards in a group: Blast-wide, this group's members, and trade rewards here.

Revenue share

Every trade made through Blast pays a 1% fee. That fee is shared like this:

You trade in the Blast bot
โ†’
1% fee
40%
You (cashback)
Back on every trade you make
โ‰ค40%
Caller
Up to 40%, when you buy from their Blast
5%
Group owner
When you buy in their group
โ‰ฅ10%
Buyback & Burn
At least 10%: buys the token and burns it
Rest
Treasury
Development, infra, growth
WhoShare of the feeOn a $1,000 buy
You (cashback)40%$4.00
Caller (when you buy from their Blast)up to 40%up to $4.00
Group owner (when you buy in their group)5%$0.50
Buyback & Burnat least 10%at least $1.00
Treasurythe restโ€”

Nobody earns a caller or owner share from their own trades; their cashback still applies.

Flex Pot payouts

Each day the top 10 callers share the pot. Places pay a fixed share, so #1 always takes 25%.

PlaceShare each
#125%
#217%
#312%
#410%
#58%
#6โ€“105.6%

How Flex rewards are calculated

Every round is worked out the same way, by the same code that pays real rounds. Step by step:

  1. X is measured from your entry
    X is the highest market cap the token reached after your call, divided by the market cap you called it at, rounded to one decimal. A call at $20,000 that peaks at $100,000 is 5.0X.
  2. 10 points for every 0.1X a call climbs today
    Points count from the best X the call had before today (1X for a new call): 1.0X to 1.5X is 50 points, 1.0X to 2.0X is 100, and 3.0X to 5.0X is 200. A call never scores the same climb twice.
  3. A bonus the first time a call reaches a milestone
    5X +50 ยท 10X +100 ยท 20X +250 ยท 50X +500 ยท 100X +1,000.
  4. All your calls add up
    Your points for the day are every call's points and bonuses together.
  5. Low calls cost points
    Each call is judged on its best X in its first 24 hours. 5 calls in a row at 1.8X or lower cost 50 points, then the count starts again. Any call above 1.8X resets it.
  6. Only eligible calls score
    Eligibility: minimum $10,000 MC call, and a 2X from call. It must also be the first Blast of that token in at least one group, by a verified caller in good standing (not banned, suspended or quarantined), on a token that isn't flagged as suspicious or marked as a scam.
  7. Your hit rate has to hold up
    A hit is a call that reaches 2X. From your 5th call of the day, under 30% hits means you stay on the board but aren't paid until it's back up.
  8. Most points wins
    Ties share a rank and split their places equally: two callers tied for #3 and #4 get (12% + 10%) รท 2 = 11% each. The top 10 are paid their share of the pot, rounded down to the cent. Anything not paid out stays in the treasury.

Worked example

A day with a $500 pot. Seven callers made new highs. ava's two calls add up to the most points. ben and dev tie on 230 and split #3 and #4. eli loses 50 points to a run of low calls. fay has points but too few hits to be paid, and gus called under $10,000. Only five places are paid, so the shares for #6 to #10 stay in the treasury.

CallerTheir dayGainBonusPenaltyPointsPlacePaid
avaA new call ran to 5.2x (5x bonus), an older one went from 3.0x to 3.6x480+50โ€”530#1$125
cleoYesterday's 9.0x call reached 10.4x today (10x bonus)140+100โ€”240#2$85.00
devOne call to 3.3x230โ€”โ€”230#3$60.00
benTwo new calls: 2.4x and 1.9x140โ€”โ€”140#4$50.00
eliA 2.0x call, but five low calls in a row finished today100โ€”โˆ’5050#5$40.00
fayA 4.0x call, but 1 hit in 6 calls today (17%)300โ€”โ€”300โ€”Hit rate under 30%
gusA 6.0x call made at an $8K market cap0โ€”โ€”0โ€”Called under $10,000
Paid out of the $500 pot$360
Places nobody reached (stays in the treasury)$140

How the leaderboards rank

The Callers, Calls and Groups boards run over the last day, week or month. Every call earns points:

points = 10 ร— doublings of the peak X + Impact รท 10

2X is one doubling (10 points), 4X is two (20), 8X is three (30). A call that never went up scores 0 for its X, never less. Impact is the verified engagement your call got in the groups.

Peak XImpactX pointsImpact pointsTotal
1.5X05.805.8
2X010010
4X020020
10X033.2033.2
4X120201232
0.4X(never went up)30033

The Callers board

Your points for every call in the period are added up. One big call can win a week, and so can steady good calls:

RankCallerCalls this week (peak X ยท Impact)Points
#1nova16X ยท 4044
#2juno5X ยท 60, 2.2X ยท 1542.1
#3rex2X ยท 20, 3X ยท 10, 1.4X ยท 0, 0.5X ยท 033.7
  • Calls ranks single calls by peak X; an earlier call wins a tie.
  • Groups adds up the points of every call made in the group.
  • Caller Rank on your profile is different: a 0โ€“100 reputation score from Impact, authenticity, consistency, originality and community trust. You need at least 2 calls (day), 3 (week) or 5 (month and all time), a verified account at least 3 days old, and a clean record.
  • In the bot, /lb ranks by cumulative X instead: see Leaderboards.
  • Banned, suspended and quarantined callers are left off every board while it lasts.

Leaderboard simulator

Change the X of each caller and the pot size to see how a round pays out. It uses the same code that pays the real rounds.

Callers and the best X of their call today
X
X
X
X
X
X
#CallerXPayout
1degen_dan12.1X$25025%
2=You6.4X$14514.5%
2=moonmaya6.4X$14514.5%
3trenchlord3.2X$10010%
4alpha_al2.5X$80.008%
โ€“paperhands1.7Xunder 2X
Paid out
$720
Back to treasury
$280

Places are fixed shares of the pot, so with fewer than 10 callers on the board the rest stays in the treasury. Callers on the same X share a rank and split the places they cover.

Earnings estimator

A rough idea of what you could earn per day, week and month.

Per day
$132
Per week
$924
Per month
$3,960
Trade fees$20.00 / day
Flex rewards$112 / day

An estimate, not a promise: real earnings depend on how much people trade and how your calls run. Group owners earn from trade fees only, not Flex. Payouts go live with the token.

Only an estimate
Real earnings depend on how much people trade your calls. Nothing here is a promise of income.
Group owners

Add the bot to your group, give it the rights it needs, and earn a share of every trade your group sends.

Add the bot to your group

  1. Open your group โ†’ tap the group name โ†’ Add members
  2. Search the Blast bot and add it
    Works in groups and supergroups, not channels. Added to a channel, the bot leaves and tells you.
  3. Continue with the next step: make it an admin

The button opens Telegram's group picker and asks for admin rights straight away. Keep those switches on.

1. Add the bot0:00 / 0:19
The bot says hello when it joins, and points admins to /setup.

Make the bot an admin

This step is required
With Telegram's default privacy mode a bot that isn't an admin never sees normal messages in the group. Your members would paste contract addresses and nothing would happen.
  1. In the group, tap the group name โ†’ Edit
    On desktop: the โ‹ฎ menu โ†’ Manage group.
  2. Administrators โ†’ Add admin
  3. Pick the Blast bot
  4. Turn on Delete messages and Pin messages, then Save
    Everything else can stay off. Leave Remain anonymous off.
Without adminWith admin
Only /scan worksPasted contract addresses get a scan card
Reactions on Blasts are not countedReactions count as verified engagement
Admins cannot remove a Blast through the botRemove Blasts (needs Delete messages)
Can miss posts if the group restricts membersCan always post Blasts and updates
Turn on Delete messages and Pin messages, then Save.

Run /setup

Send /setup in the group. Only group admins can. The bot replies with a checklist of what it can do:

โœ… Post Blasts and thesis updates
โœ… Track replies to calls
โœ… Track reactions (requires admin)
โœ… Remove Blasts (admin right: delete messages)

Anything with โš ๏ธ tells you which admin right is missing. Tap โš™๏ธ Configure group to open the group settings.

/setup: every line should be โœ….

Group settings

SettingWhat it does
Calls enabledTurn Blasts into this group on or off.
Accept external BlastsAccept calls sent through the bot or the app.
Members onlyCallers must be current members of the group (checked live).
Verified callers only / minimum tierAccept calls from Verified, Trusted or Proven callers only.
Blasts per hour / per caller per dayRate limits so the group never gets flooded.
Post thesis updatesPost a caller's updates under their original call.
Scan cardsReply to pasted contract addresses with a scan card (needs admin).
Card pictureBanner or Chart on top of every Blast and scan card here.
Track replies / reactionsCount engagement on Blasts in this group.
Calls topicIn a forum group, post Blasts into one topic.
  • New private groups start members-only. Members don't have to do anything: the bot checks with Telegram that they're in the group when they pick where to Blast.
  • Admins and the owner can always Blast into their own group, whatever its tier bar.

Register as owner

  1. Make sure you are the group's creator
    Admins can't register, only the person who created the group (or who it was transferred to).
  2. Send /owner in the group
    If you post as the group (anonymous admin), turn off Remain anonymous first.
  3. Check your reward wallets with /myrewards in the bot's chat

From then on you earn 5% of the trade fee from every trade that starts from a Blast or a scan card in your group. If the group is transferred, the new creator sends /owner to take over.

What the bot posts in your groupNew

WhenThe bot posts
A member pastes a contract addressA scan card naming who scanned it. A verified memberโ€™s scan becomes their call at that market cap.
An unverified member scansA reminder to get verified: within 30 minutes, the scan is recorded as their call.
A scan that wasnโ€™t a call runsA reply tagging the scanner when it passes a milestone, for 7 days.
A call passes 2X, 5X, 10Xโ€ฆIts Flex card, as a reply to the Blast.
A token scanned or Blasted here gets DEX PAIDThe DEX PAID banner, as a reply to its card.
A caller adds a thesis updateThe update, as a reply to the original Blast.
One member tips anotherThe tip under the TIPPED banner (from $1, once an hour per pair).
The scan card's BLAST IT button
The person who scanned taps it, then taps again to send the call to every group they can Blast to (only the number shows in your chat, never the names). Anyone else who taps it is sent to the bot to Blast it with their own entry.
A tip between two members, announced under the TIPPED banner.

Group earnings

Send /rewards in the group for its members' Flex rewards and what trades started there have shared, or /earnings in the bot's chat for your own totals (the ๐Ÿ‘‘ Groups line). Group owners earn from trade fees only, not from Flex.

Grow it
More active callers in your group means more Blasts, more Buy taps and a bigger share for you. Pin the bot's welcome message and tell members to send /connect.
Fair play

Rankings and rewards only mean something if they can't be gamed. What gets flagged, what it does, and how to stay clear.

Suspicious tokensNew

Before a call is made, and again as its price moves, Blast checks the token for the shape of a fake: a contract that won't let holders sell (a honeypot), a high sell tax, an owner who can change balances, a market cap with almost no liquidity or volume behind it, buys with no sells, or a spike no real market makes in minutes.

โš  SuspiciousThe yellow label on a flagged token's calls, on the website and in the app.
A flagged token
Can it be called?No. A new call is refused with the reasons, before anything is sent.
Calls already madeLabelled โš  Suspicious, off the public feeds, the leaderboards, scoring and the Flex Pot.
The callersGet a message saying why. It is a warning, not a strike.

The team can flag a honeypot the automatic check missed, with the same effect. A token the team marks as a scam is different: that is red, and it gives every caller a strike (see 3-strike rule).

Flags, suspensions and bans

Rankings and rewards only mean something if they can't be gamed. This is what can happen to an account, and why:

WhatWhyWhat it does
ReportAnyone can report a call or a caller for spam, a scam, abuse or a misleading call.Our team reviews it. Three open reports on one account put it up for review.
Automatic checksReactions in sync, engagement rings, accounts engaging on everything, Blast spam.That engagement doesn't count, and the trust score of the accounts involved drops.
FlagThe team flags an account it is watching.Lowers its trust score, which can take it off Caller Rank.
StrikeYou called a token we later marked as a scam.A warning on your profile and the leaderboards. Three means quarantine (see 3-strike rule).
QuarantineThree scam strikes.One week with no new calls, off the Flex Pot and every leaderboard.
SuspensionSet by the team for a fixed time.No new calls until it ends.
RestrictedThe account is under review.No new calls while it is reviewed.
BanSerious or repeated abuse.No calls, no rewards or claims, and off every board.
Think a call is a scam?
Open the call and tap Report. Reports are private: the caller never sees who sent one.

3-strike rule

Callers are responsible for what they call. When our team marks a token as a scam (a rug, a honeypot, a drained pool), every caller who called it before it was marked gets a strike.

1/3First warning2/3Last warning3/3Quarantined for a week
  1. Strikes 1 and 2: a warning
    A yellow triangle with your count shows on your profile and next to your name on the leaderboards, and the bot tells you which token it was.
  2. Strike 3: one week in quarantine
    For 7 days you can't make new calls, and you're left off the Flex Pot and every leaderboard. Money you already earned is safe, and you can still claim it.
  3. Strikes don't reset
    They stay on your record. Every scam call after your third strike means another week in quarantine.
Avoiding strikes
Check the contract before you call: liquidity locked, mint and freeze authority revoked, no single wallet holding most of the supply. If a token is unmarked later, its strikes are removed.
Reference

Every command the bot has, and where to ask when you're stuck.

Bot commands

These are the menus Telegram shows when you type /. In the bot's chat you can also just paste a contract address, any time.

In the botโ€™s chat
/startOpen BlastRead more
/guideHow to use, step by stepRead more
/loginSign in on the websiteRead more
/walletTrading walletRead more
/tradePaste a contract address to tradeRead more
/blastPaste a contract address to publish a callRead more
/portfolioTokens you hold and their PnLRead more
/ordersYour limit ordersRead more
/tipTip a callerRead more
/lbTop callers: day, week, month, all timeRead more
/flexDaily Xs leaderboardRead more
/earningsWhat you earned, and claim itRead more
/claimClaim your rewards to your walletRead more
/myrewardsYour Flex rewards, claims and reward walletsRead more
/rewardsFlex pot top earners across BlastRead more
/dpDEX PAID or not: /dp <CA>Read more
/settingsCard picture: banner or chartRead more
/verifyVerification statusRead more
/mycallsYour callsRead more
/cancelCancel the current flowโ€”
/helpHelpRead more
In a group
/setupConfigure (admins)Read more
/connectAllow yourself to blast hereRead more
/scanScan a token: /scan <CA>Read more
/dpDEX PAID or not: /dp <CA>Read more
/ownerRegister as group owner (creator only)Read more
/flexFlex a call that ran (2X or more)Read more
/rewardsFlex pot earners: all of Blast and this groupRead more
/lbTop callers: day, week, month, all timeRead more
/helpHelpRead more
  • /leaderboard works as well as /lb, and /scan <address> works in the bot's chat too.
  • /setup, /connect and /owner only work in a group. Sent to the bot they explain that, with a button to add the bot to a group.
  • /tip in a group points you to the bot's chat, where the tip is sent from your wallet.

Need help?

Check the FAQ, write to us from the support page or ask us on our socials. In the bot, /help lists every command.

Looking for the old guide? It moved here: every link to it opens this page at the same section. Something missing? Tell us.